FUZJA – stage 8
Building G2 - residential building
- location: Łódź, ul. Tymienieckiego 13a
- architects: Przemo Łukasik, Łukasz Zagała
- associate architects: Dawid Beil, Małgorzata Czechowicz, Justyna Siwińska-Pszoniak, Paulina Słocińska, Sebastian Dziedzic, Andrzej Dukalski, Damian Langer, Małgorzata Kasińska, Izabela Moskal, Natalia Sołjan, Adela Czeczotka, Aleksandra Mazur, Tomek Drozd, Adam Wasilewski, Michał Sokołowski
- consruction: Industria Project
- installations: Elsanteam, eNNpro, WN-PROJEKT, BZB Projekt (sieci-procedury administracyjne), Marcin Wejner (sieci), Pracownia Projektowa Luksan (sieci, procedury administracyjne)
- road design: Seweryn Wróblewski
- signage: Joanna Katańska
- greenery design: Krzysztof Kass KASS-Architektura Krajobrazu
- conservation work programme: Archi-projekt Szymon Herman
- eexpert opinion on building physics: W-ART Robert Wójcik
- chemical and mycological tests: AONT Akademicki Ośrodek Naukowo-Techniczny
- investor: Echo Investment
- usable floor area: 11 762 m²
- design: 2021-2023
- realization: od 2023
- investment website: https://echo-fuzja.pl/lofty
The G02 building consists of two parts: a two-storey printing shop, drapery, ink kitchen and drying room built at the end of the 19th century, and an engraving and rolling mill added in the early 20th century. The expansion of the building is reflected in the façade: the lower part has arched vaulted windows, the upper part has arched vaults only on the ground floor, with modernist rectangular large-format windows above. The local development plan allows for the superstructure of the building. This provided the potential to create a diverse range of flats: from tall loft flats with mezzanine floors directly adjacent to the existing walls, to standard height flats located in the new superstructure. The project was developed in close collaboration with the Provincial Office for Historic Preservation. A number of analytical studies were produced to help us place the new function in the old walls in the best possible way.